Hub update – 27 May

There have been a lot of workers on the HUB site through April and May so there is much progress both inside and out to explore in this episode.

The concrete entry path, and steps across the front of the building are completed.

Governor Charles La Trobe and the old streetlight are reinstalled in Field Park.

In the Library, the ceiling has been finished and two smart circular lights had been installed.

​All is painted in the basement, and floor coverings are laid in the QHM Storage areas the Foyer and the Collection Studio.
Upstairs the Museum has been painted and the track for the Specialist Lighting was being in installed in the QHM Exhibition space by the Studio All Technicians.