The HUB Fit Out Pace Picks Up.

The Queenscliffe HUB building site has been a hive of activity as the pace of the fit out picks up as the completion date at the end of June approaches.

Concreting, installation of glass, flooring and the Museum storage systems all happen in this episode. Painters have started giving the old library building a fresh coat of paint and the brickwork of the1970’s extension to the old library building is rendered.

​The stylish panel beside the front door is installed with the Wadawurrung name of the HUB, “Wirrrng Wirrng” meaning listen with both ears.