Scroll Top

Hub update – April

There has been lots of action at the Queenscliffe HUB this month with landscaping of Field Park beginning and preparations for installing the feature glass façade and concreting the courtyard progressing. Governor LaTrobe and the old gas lamp have been moved.

Around the back of the building the wall cladding is going on which makes this part of the HUB look finished. Cupboards have been delivered and some have even been installed in the staff room and the Museum Collection Studio.

​Walls are being plastered and preparations are under way for installing the ceiling in the Museum’s Exhibition Space and the Visitor Information Centre.